SandFlow · Services

Understand first. Then calculate. Then drill.

We read the documents that are usually available anyway, and turn them into reliable input values for the drilling fluid.

01

Ground & route

  • Evaluation of geotechnical reports, soil logs and longitudinal sections
  • Soil groups, characteristic values, groundwater levels, water protection areas
  • Drilling fluid calculations based on homogeneous zones relevant to drilling fluid
  • Bore path evaluation, proposals for route optimization, support with vertical planning
  • Feasibility check and risk analysis
02

Calculation

  • Pulling force calculation and pipe statics
  • Bending radius, entry and exit angles, rig setback
  • Borehole hydraulics and annulus geometry
  • Tool selection for soft ground and rock
  • Displacement volume, pump sizing, material demand

Why we calculate beforehand

A rig that stands still costs more than any mix. If you know flow rate, annulus and material demand beforehand, you do not have to improvise on site, and you complete the drilling without unplanned downtime.

Every value with its source

Every adopted value is backed by document ID, revision status and page number. The answer to where a layer boundary comes from is in the document, not in someone's memory.

Claims & drilling advice

Support with claim texts, assessments and the justification of claims, using the data from planning and drilling progress. On request also drilling-technical advice, from tool selection to questions of method.

03

The drilling fluid program

A project-specific document per crossing in line with DIN, not a general product recommendation. Delivered as a program (Word/PDF, revisable), a quantity calculation (Excel with linked formulas per pipeline axis) and a drilling progress table. Revisions are included: client comments are worked into the same structure.

Mix design based on groundBase bentonite, additives, dosage in kg/m³ or l/m³
Mixing waterHardness, target pH, treatment with soda ash
Borehole hydraulicsFlow rate, annular velocity, pressure losses
Quantity calculationAnnular volume per pipeline axis
Material demandDemand per product for pilot, reaming and pipe pull-in
Drilling progressSection-by-section allocation of mix and quantity
RisksLoss zones, borehole collapse, swelling clays, salt influence
04

Tested with the ground that is actually there

In the conditioning test, mix variants are run with the soil samples from the route. Result: a test report and a mix and product proposal.

ParameterWhat it tells you
Funnel viscosityCarrying capacity and pumpability
DensitySolids content, support pressure
API filtrate lossWater loss to the formation
Filter cakeSealing of the borehole wall
Yield pointCuttings transport capacity
Gel strength 10 s / 10 minSuspension ability at standstill
Sand contentWear and recycling performance
pH / water hardnessHydration, polymer performance, soda ash demand

Documented reference values

Mixing water: pH 8.5–9.5, adjusted with soda ash

SwellGel R, 4.5 % in tap water: PV 7.0 mPa·s · YP 52 · Gel 29

ModiBore: API filtrate < 15 ml/30 min, < 10 ml under favorable conditions

PDC bit on a drilling rig, black and white
PDC bit
HDD job site, bore in limestone: rig with drilling fluid in the pit
HDD job site, bore in limestone
05

The fluid is not just mixed. It is run and steered.

A mix design is a starting condition. What happens next is decided by the ground and the response to it.

  • Daily fluid monitoring in the field lab
  • Adjusting the mix at every change of layer
  • Immediate help with loss zones and blowouts: fluid parameters are adjusted first, then Modisorb 200 is added as a loss pill
  • Measurement log per shift, fluid report at handover
  • Allocation of returns for recovery or disposal

The five stages at a glance

  1. Understand the ground requirements (Ground evaluation)
  2. Develop the program, calculate parameters (Fluid program + quantities)
  3. Prove suitability (Test report)
  4. Support the site (Measurement logs)
  5. Hand over the evidence (Fluid report)

Technical supervision A/B per DVGW GW 329 as well as site management and supervision for HDD and microtunnelling: both managing directors are qualified accordingly.